1. Earthing switch opening: Insert the operating handle into the earthing switch operating hole and turn it counterclockwise to open. At this time, the open/close indicator in the center of the panel shows the "open" state; the lower door panel is locked.
2. Load switch: Insert the handle into the operating hole and turn it clockwise (for electric operation, press the closing button to close). At this time, the open/close indicator shows the "open" state.
3. When fan-shaped contacts are used, the earthing contacts of the lower earthing switch are installed at positions 1, 4, and 6.
4. When copper bar connections are used, the earthing contacts of the lower earthing switch are installed at positions 2, 3, and 5.
en
English
русский
Español
عربى
Français
Português 
















